Topics
Collection of daily project progress updates
Our Product Management tool allows you to edit Daily Logs with ease, providing you with the ability to make necessary updates to reflect the latest information. Please note the following guidelines for editing Daily Logs:
1. Access the Daily Log:
Locate the specific Daily Log entry that you wish to edit within the tool’s interface. You can typically find the Daily Log section or a dedicated log management area.
2. Timeframe for Editing:
Daily Logs can be updated within a limited timeframe. You can edit a Daily Log entry for up to 7 days from its initial creation date. Ensure that you are within this timeframe to make changes to the log entry.
3. Editing Restrictions:
Once a Daily Log entry is saved, the information entered in the previous log cannot be directly modified. Each update is saved with a timestamp, preserving the integrity of the original entry. However, you can create a new log entry to provide the updated information.
4. Make the Desired Edits:
When editing a Daily Log entry, focus on providing the most accurate and up-to-date information. Add or modify content under the relevant headings, such as the work log, material log, meeting log, non-conforming work, accident log, or any other sections available in the Daily Log template.
5. Save the Updated Entry:
Once you have made the necessary edits, save the updated Daily Log entry. This action will create a new log entry with a new timestamp, capturing the changes made.
Please keep in mind that the ability to edit Daily Logs is limited to the designated timeframe, and each update is saved as a new entry with a timestamp. This ensures the transparency and historical record keeping of the Daily Logs.